How is lateness handled?
A lot available after the need date never covers the demand “on time”. By default, once every on-time allocation is made, later lots may cover the demands still open: the line is marked “late” with the number of days. You can refuse late cover.
Which columns do I need?
Demand side: an item (PN, SKU, reference) and a quantity; need date, priority, ID, customer, site and unit are optional. Supply side: an item and a quantity; availability date, type (stock or receipt), site and unit are optional. Columns are detected and can be changed.
Is the result optimal?
AllocLab applies deterministic, explainable rules (date, priority, file order, fair share). These are heuristics: they do not guarantee a global mathematical optimum, but the same file always gives the same result and every quantity is traced.